About Us
About Us
How the work is arranged, and what has not changed as it grew.

Background
Cleveland CMM Calibration and Repair coordinates performance verification, repair and programming for coordinate measuring machines used across Northeast Ohio's forging and investment casting supply base. The region's forge shops and foundries run CMMs for first article inspection, die and tooling verification, and distortion checks after heat treat, and send calibration work out when an audit, a crash, or a due date requires it. Work is placed with laboratories accredited to ISO/IEC 17025:2017 and matched to the frame type and test standard the customer's machine was actually built to โ a bridge CMM under ISO 10360-2, a portable arm under ISO 10360-12 where applicable to the arm and probe configuration, a rotary table under ISO 10360-3.
A Brief History
Requests arrive from quality managers at Tier 2 and Tier 3 suppliers, contract manufacturers and independent job shops, almost always driven by a registrar or customer audit. The common thread is a certificate that has to survive scrutiny: a stated uncertainty, a documented decision rule, as-found data recorded before adjustment, and a traceability statement naming the actual chain.
Scheduling is built around downtime. A CMM under calibration is a stopped inspection department, so on-site visits are planned around production shutdowns and shift changes. Out-of-tolerance findings are reported with enough detail to support a reverse-traceability impact assessment back to the last passing calibration, not just an as-left result.

What the Work Is Measured Against
These are the operating commitments the work is measured against.
- 01
As-found first
Deviations are recorded before any adjustment is made to the machine.
- 02
Scope before quote
The performing laboratory's accredited scope is checked against the instrument before work is accepted.
- 03
Standard matched to frame
Bridge, portable arm, tracker and rotary table each test to a different standard.
- 04
Documented decision rule
Statements of conformity state the rule applied, not just a pass or fail mark.
See Also
The standards, traceability arrangements and management system behind the work are set out on the quality system page.
Reviewing a new supplier?
Every quotation includes the scope, turnaround and documentation that applies.